MENU
products
  1. Home
  2. --
  3. Industrial boilers

ldv boiler project

Product Thermal Capacity: 1 - 20 t/h

Working Pressure: 0.7 - 2 Mpa

Available Fuel: Nature gas, coke oven gas, biogas, methanol, liquid propane gas, diesel, heavy oil, light oil, crude oil, etc.

Available Industries: Heat supplying, chemical, food, textile, printing and dyeing, cigarettes and tobacco, fodder, pharmacy, building materials, brewery, rubber, hospital etc.

Get a Quote Send Message

Introduction of WNS gas / oil fired steam boiler:

WNS series horizontal internal combustion boiler is a boiler shell type 3 passes wetback oil/gas fired boiler. After fuel is being atomized by burner, flame is full of the wave furnace and transfer heat via furnace wall, this is 1st pass; the high temperature smoke is collected in reversal chamber and then enters 2nd pass which is grooved tubes bundle area; after heat convection, air temperature gradually falls and goes to front smoke box and turn to 3rd pass, which is smooth tubes bundle area, and then enters chimney passing back smoke box and exhausted to the atmosphere.

Technical advantages:

1. Digitized manufacture
The key part such as material cutting, rolling, drilling are proceeded by advanced CNC machining process to reduce the assemble stress and extend boiler working lifetime.
The front and back smoke chamber plates are cut by CNC plasma cutting machine and looks tidy and beautiful.

2.Easy operation and maintenance
Fully automatically operating, with automatically adjustment and protection of burning, water level, temperature and steam pressure.

3. Longer working life
Smoke tube and tube sheet connection is expanded first to eliminate the gap between them, then adopt automatic argon arc welding to relief the stress and expand boilers working life.
Longitudinal and girth joint adopt advanced automatic submerged-arc welding for good welding quality. All longitudinal and girth joint will have 100% radiographic inspection.
Fin tube us ND steel or stainless-steel material which avoid low temperature corrosion.
Inspection procedure point is set up to guarantee the sequence of expanding and welding, avoid cracking of the tube sheet holes.

4. Less fuel consumption
High quality aluminum silicate fiber is used with fire clay insulation, to control the boiler body temperature below 45℃ to control heat lost.
Sufficient steam storage room and heating area makes boiler to generate high quality steam and high thermal power.
Condenser is added to reuse the waste heat of the exhausted smoke to increase feeding water’s temperature and reduce emission temperature, which can increase the thermal efficiency above 98% and save operating cost.

PROCESS DESIGN OF STEAM BOILERS (PROJECT STANDARDS

Headquarters: Washwood Heath, United Kingdom PROCESS DESIGN OF STEAM BOILERS (PROJECT STANDARDS AND SPECIFICATIONS) Page 3 of 45 Rev: 01 April 2011 SCOPE This Project Standards and Specifications is intended to cover minimum requirements for process design of field erected water tube boilers. REFERENCES Throughout this Standard the following dated and undated standards/codes are referred to.

Edd China reveals why he'd never rejoin Wheeler Dealers

Feb 24, 2019· Edd China is a legend in these parts so we sat him down for a chat about Wheeler Dealers, the best (and worst) cars he has worked on and what's next for …

LDV - Custom Specialty Vehicle Manufactur

With so much riding on your vehicle, at LDV, we perform better so you can. Custom Specialty Vehicles You Can Count On. As pioneers in custom specialty vehicle manufacturing, we know consistent performance is more than just another benefit – it’s a must. That’s why we infuse over 40 years of experience into every truck we build or retrofit

What is a Boiler: Introduction to Boilers - Forbes Marsha

File Size: 59KB What is a Boiler: Introduction to Boilers A boiler is an enclosed vessel that provides a means for combustion and transfers heat to water until it becomes hot water or steam. The hot water or steam under pressure is then usable for transferring the heat to a process.

Boiler Design & Installation | Projects | Burns & McDonne

Deliverables included layouts, piping routing, boiler and feedwater system specifications, building specifications, foundation design, electrical design and tie-in designations. Burns & McDonnell purchased all equipment for this project.

Buildings - Project Requirements for Owner - Boiler Syst

Owner Project Requirements: Boiler Licensed High Pressure Boiler Operation Engineer License If the boiler project exceeds the work allowed under the two categories of Limited Boiler Work listed above, a Registered Design Professional must submit construction plans for approval by the Department in order to obtain a work permit.

Packaged Boiler Project - JR

Packaged Boiler Project. This project provided the engineering services for the installation of five (5) 80,000 PPH packaged steam watertube boilers and associated equipment to replace an aging steel mill power house. The project included equipment layout and interconnecting piping drawings for the five boilers, (3) deaerator tanks, (5) duplex

LDV - Laboratory Grade Exhaust Valve - Price Industri

The LDV laboratory grade exhaust valve features fully welded, 316 stainless steel construction to withstand airborne contaminants and corrosives in the most demanding applications. Features Continuously welded, 20 GA. type 316 stainless steel construction for corrosion resistance

Gas-Fired Boilers | Building America Solution Cent

The lowest efficiency boilers are atmospherically vented, Category I boilers. A Category I boiler operates with the flue at negative pressure with respect to the combustion appliance zone (CAZ), i.e., the room in which the boiler is located, and the stack temperature is above 140°F, which is hot enough to avoid condensation in the vent. The burner draws its combustion air from the CAZ.

2020 Boiler Costs | Installation & Replacement Co

New Boiler Costs. Installing a new boiler costs $5,570 on average with a typical range between $3,444 and $7,699.A standard efficiency model (80%-89% AFUE) runs an average of $3,000 to $6,000. High efficiency models (90%+ AFUE) cost $6,000 to $11,000. Of that, labor costs $1,000 to $2,500.The main cost factors you’ll need to consider include brand, BTU needs, type of boiler and what you can

Vertical Boiler Project - Model aircra

4/10/11 Preparing the boiler for rivets. 4/17/11 Riveting the boiler end plates. 4/23/11 Installing the boiler tubes and fittings. 5/7/11 Building the firebox and burner. 5/11/11 Building the smoke stack. 5/16/11 Plumbing the boiler. 5/22/11 Building the boiler feed pump. 5/26/11 Finishing the project

Contact Us

zhulin@zozen.com

No. 76, Xin Da Road, Zhou tie Town, Yixing, Wuxi, China

0086-510-68530066, +86-13506151292

Get Latest Price
Get in Touch

If you have any problems about our product and service,please feel free to give your inquiry in the form below. We will reply you within 24 hours as soon as possible.Thank you!

  • Boiler type
  • Name
  • email
  • Phone or Whatsapp
  • message
I accept the Data Protection Declaration

Copyright © 2020.Zhongzheng Boiler Co., ltd. All rights reserved.

top